New-build housing
Multi-plot housing phase: blockwork and scaffold lifts, Mid Wales / Shropshire border
Brick and block across several plots at once, from beam-and-block floors through scaffold lifts to roof trusses
Service
KW Brickwork Contractors Ltd, based in Welshpool, Powys, takes on large-scale brickwork packages across Mid Wales, Shropshire and the West Midlands. We work on multi-plot housing phases and larger public-sector and commercial buildings, planned around your programme and run by NVQ Level 3 qualified bricklayer Kris Williams.
On a larger job the question isn't only whether the bricklayer can build a good wall. It's whether the brickwork package will keep pace with everything else on site, week after week, without the site manager having to chase it. That's what this page is about.
Our photos include multi-plot housing phases with beam-and-block floors going in across several plots at once, rows of houses scaffolded together, and public-sector buildings with long elevations of facing brick built off scaffold. That's the kind of work we plan for.
Before we start a larger package we agree the sequence with you: which plots or elevations first, when each scaffold lift will be ready, where materials will be delivered and stored, and how the brickwork fits between groundworks, scaffolding, roofing and other trades. We price and plan from the drawings and your programme, and we're honest at quote stage about what we can resource and when.
On multi-plot work we try to keep the gang moving in a steady rhythm across plots: loading out the next plot while the current one is being built, so no one is standing waiting for materials or scaffold.
The bigger the job, the more the finish depends on consistency. We blend bricks from several packs so there's no colour banding between plots, keep joint thickness, gauge and pointing profile the same throughout, and set out each plot or elevation from the drawings rather than copying the one next to it. Stone bands, plinths and contrasting panels have to line through on every building.
Site managers on large jobs need to know where the brickwork is and what's coming. We keep you updated on progress, raise drawing queries in writing and early, and tell you in good time about anything that could affect the programme, such as materials, weather or access. Cold or wet weather is planned for rather than ignored. We follow the NHBC Standards and the specification on when masonry can be laid and how new work is protected.
We don't publish headline numbers for gang size or output here, because the honest answer depends on the job and when you need it. Tell us the scope and programme and we'll tell you straight what we can commit to.
Large sites run on good housekeeping. We keep our working areas and scaffold lifts clear, stack materials safely within scaffold loading limits, clear up brick cuts and packaging as we go, and follow the site's rules, inductions and method statements.
With a limited company run directly by the bricklayer, the person pricing the job is the person on site. Decisions about setting out, materials and sequence don't have to go through layers of management, and the site manager has one number to call. Kris is on site and knows where the work stands. For a main contractor or housebuilder, that means fewer surprises and a faster answer when something changes.
Send the scope, drawings and programme. The more detail you give, the more useful our first reply will be.
We review the drawings, visit the site and agree access, storage and sequence with you.
You get a price and an honest view of what we can resource and when, so the programme is realistic from day one.
We work to the agreed sequence, keep you updated, and raise issues early rather than late.
From our base in Welshpool, Powys. Each area page explains local building context and how far we travel.
New-build housing
Brick and block across several plots at once, from beam-and-block floors through scaffold lifts to roof trusses
Public sector
Facing brick built off scaffold as a cladding skin against wall panels on public-sector buildings
New-build housing
Facing brick and blockwork cavity walling off scaffold, from first lift to topping out
It depends on the scope and timing. Send us the drawings and programme and we'll tell you honestly what we can resource and when, rather than promise a figure up front.
Yes. On multi-plot phases we load out ahead and move across plots in sequence so the work keeps a steady pace.
We blend bricks from several packs, keep gauge, joints and pointing the same throughout, and set out every plot or elevation from the drawings.
We plan for it. We follow the NHBC Standards and the specification on when masonry can be laid and how new work is protected, and we tell you early if weather will affect the programme.
Yes. Site managers get regular updates, drawing queries are raised early and in writing, and anything that could affect the programme is flagged straight away.
Yes. Wolverhampton, Walsall and the wider West Midlands are within our area, and larger developments and contract packages there suit us well.
Send the drawings, plot numbers or a few site photos on WhatsApp, or give Kris a call. Based in Welshpool, covering Mid Wales, Shropshire and the West Midlands.